Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
News Super Search
 ↓ 
×
Member:
Posting Date From:
Posting Date To:
Category:
Zone:
Language:
IR Press Release:

Search
  Go  
dark modesite support
 
Sat Jul 6 11:10:07 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Advanced Search
<<prev entry    next entry>>
News Entry# 558714

9 Posts

9516 views
0

Jul 03 (22:25)
Exynos9611~
Exynos9611~   17356 blog posts
Re# 6113198-10              
ok
Translate to English
Translate to Hindi

6208 views
0

Jul 04 (10:13)
ER_PRAGADESH_SK_NGT^~
ER_PRAGADESH_SK_NGT^~   17796 blog posts
Re# 6113198-11              
Problem with mangaluru division is where it will get 600 kms line. Atleast if KR merged with IR, Mangalore division can be created by merging Vasco londa, Swantwadi jokkatte, mangalore to hassan lines. In such case TVC and PGT can be merged to become ERM division containing entire KL lines. POY NYY to TVC can be merged with MDU divison. SCT to QLN can be brought under ERM division. getting consenus will be tough. Easy solution is mangalore KA portions can be merged with mysore division.
Translate to English
Translate to Hindi

4612 views
0

Jul 04 (16:27)
irifan2015~
irifan2015~   2452 blog posts
Re# 6113198-12               Past Edits
Actions should be in a composite way in steps.
1. Remove Mangalore and surrounding 35 kms from SR PGT and merge with SWR MYS. From Manjeshwaram onwards up to SWR MYS.
2. Remove POY Kinathukadavu 22 kms from PGT and give it to SA division.
3. To compensate loss of 55-60 kms to PGT, give TCR SRR from TVC division
...
more...
(33 kms) and TCR GUV (23 kms).
4 Attach NCJ CAPE, NCJ TEN to MDU division(90 kms).
5. To compensate loss of app 140 kms of TVC division, attach Quilon Tenkasi (102 kms).
6. MDU gets and gives. No much difference.

Translate to English
Translate to Hindi

4301 views
0

Jul 04 (16:43)
ER_PRAGADESH_SK_NGT^~
ER_PRAGADESH_SK_NGT^~   17796 blog posts
Re# 6113198-13              
Exactly. This is what needed to be done. PGT can develop Guruvayur thirunnavarya, TVC can develop sabari line. .
Translate to English
Translate to Hindi

3260 views
1

Jul 04 (17:27)
irifan2015~
irifan2015~   2452 blog posts
Re# 6113198-14               Past Edits
1 compliments
Agree
Yes. Zero new lines in the last 3 decades. Guruvayoor to SRR-MAQ line was surveyed n number of times but zero result. Ditto for Angamaly Sabari line.
Instead of relying on Mangalore and Nagercoil/ CAPE, both divisions can concentrate on building new lines.
Translate to English
Translate to Hindi
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy