Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Sun Sep 8 22:28:07 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Post PNRPost BlogAdvanced Search

Blog Entry# 6077479
Posted: May 27 (22:35)

No Responses Yet
Rail News
1558 views
0

Metro
CMRL/Chennai Metro
May 27 (22:35)   Chennai Metro Phase 2 Nears Completion: 20 km Operational, More Segments to Open by 2028

Exynos9611~   18807 news posts
Entry# 6077479   News Entry# 553844         Tags   Past Edits
read full article... Chennai Metro Phase 2: Construction of 20 Kms Network Across City Completed

Chennai's 116.1 km Metro Rail Phase 2 project, costing 61,843 crores, is nearing completion. The project, which began in November 2020, is divided into three corridors with a total of 118 stations. A 42.6 km underground segment with 45 stations is included. Currently, 20 km of the project is...
more...
operational, connecting 25 localities. The project is being completed in stages with some sections already operational, while others are under construction. The first segment expected to open is between Porur and Poonamallee before the end of 2025. The Thirumayilai metro, serving as an interchange between corridors 3 and 4, is expected to open last in 2028. Construction on some segments, such as OMR and Mylapore, has been delayed due to contract issues and legal challenges.

Chennai ka 116.1 km ka Metro Rail Phase 2 project, 61,843 crore ka, almost khatam hone wala hai. November 2020 mein shuru hua yeh project, teen corridors mein baanta gaya hai, jismein 118 stations hain. Ismein 42.6 km ka underground segment bhi hai, jismein 45 stations hain. Ab tak, 20 km...
more...
project chal raha hai, aur 25 localities ko connect kar raha hai. Yeh project stages mein complete ho raha hai, kuchh sections chal rahe hain, aur baaki construction mein hain. Porur aur Poonamallee ke beech ka segment pehle khulega, 2025 ke aakhri mein. Thirumayilai metro, jo corridors 3 aur 4 ko connect karega, 2028 mein aakhri mein khulega. Kuchh segments, jaise OMR aur Mylapore, mein construction ruk gaya hai, contract issues aur legal challenges ki wajah se.

Travel SAFE

1. RailFanning does NOT MEAN dangerous pics/videos.
2. Doorplating pics/youtube videos are strictly FORBIDDEN in IRI.
3. Take plenty of food pics and other safe pics.
4. Write human interest narratives to make the pics interesting.
5. Enjoy blogging and travelling SAFELY.

REMEMBER: YOUR LIFE is the most precious thing, NOT RailFanning.

Leading Polls

Rail News

New Trains

Site Announcements

  • Entry# 5648027
    Mar 01 2023 (12:44AM)


    In response to past confusions with Train/Station updates and resulting fights and controversies, the following clear and objective guidelines are being issued, with no room for any arguments or debates about validity. Also, included, some other changes with respect to Ratings. 1. All Red Ratings will require further explanation. Red Ratings won't...
  • Entry# 5388512
    Jun 24 2022 (08:45AM)


    As announced previously, there are a few changes coming to IRI user accounts, based on past practices. 1. As before, you will be able to quickly DELETE your IRI User account at ANY time. However, the menu option for this was hidden in the profile page, and could not easily be located....
  • Entry# 5148000
    Nov 29 2021 (06:40AM)


    A new feature will be released soon, whereby you can follow blogs tagged with specific Trains & Stations. If you have already posted blogs tagged with some Train/Station, then you will be set to automatically follow that Train/Station. Thereafter, any future news/blogs tagged with those Trains/Stations will be marked to your...
  • Entry# 5093784
    Oct 13 2021 (07:04AM)


    These days, every other day, we are getting requests from members to allow email login to their FB-based IRI account. 10 years ago, we had given the option for users to login through FaceBook - in retrospect, this was a mistake. These days, apparently, users are quitting FaceBook in droves because...
  • Entry# 4906979
    Mar 14 2021 (01:12AM)


    Followup to: Fmt Changes The new version of FmT 2.0 will soon be here - in about 2 weeks. As detailed in the previous announcement, many of the old FmT features like Train TT, Speedometer, Geo Location, etc. will be REMOVED. It will be a bare-bones simple app, focused on trip blogging. It...
  • Entry# 4898771
    Mar 06 2021 (10:33PM)


    There are some changes coming to FMT. Many of the features of FMT, like station arrival, TT, speed, geo, passing times, station time, etc. are ALREADY available in OTHER railway apps. So all of these features will be REMOVED. We'll have ONLY BLOGGING - quick upload of pics/videos/audio, etc. You may attach...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy