Pictures of renovated Mohanpur staion which will turn into a junction after start of Hansdiha line. 90% work is completed. Construction of new station building, three new platforms, one for Dumka line (down line), two (up and down both) for Hansdiha line, three stairs, one each for platform no. 1 & 4 and one common stair for platform no. 2&3, three ramps attached in the back side of stairs, all completed. Rail laying work is also completed. Proposed shades are erected. 50% of flooring work on platform is completed. 100% of signaling work is due to be done.