OHE van doing the final touch at MBP station rail Electrification works between Dal Jn to Sitapur Jn expected to be over by Dec with loco trial with WAP 4 or 5 Let's see what happens in Dec. More trains are expected to get diverted via Sitapur after RE work gets over.