What's the point of excessive stoppages in other states for AP AC Express? After Vijayawada, the train can have a Technical halt at WL and can run with the slots of Chennai Garibrath Exp. Why an AC LHB cant haul at ICF GR speeds. They can comfortably minimize travel time to 6 hours to unleash the monster. 12803 VSKP_HNZ swarna jayanthi is far better than this train.
Shame on the IR for wasting the AC SF trains like this.