Road Under Bridge or RUB work, near DMW Halt, Patiala is going to start either today or tomorrow as NRCO officials were making preliminary arrangements at the site yesterday with a huge crane lifting and assembling the precast RCC boxes at one place. A traffic block shall be imposed for 6 hrs. After this, we may bid adieu to the LC no 15 C here ...bye bye !! There is an ROB, and now RUB been constructed near this LC, as there is a lot of heavy traffic including loaded trucks on this road, the ROB was much needed, The RUB is being constructed for two wheelers etc, specially for DLMW staff.