Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Search Trains
 ↓ 
×
DOJ:
Dep:
SunMonTueWedThuFriSat
Class:
2SSLCCEx3AFC2A1A3EEAVSEV
Type:
 

Train Details
Words:
LHB/ICF:
Pantry:
In-Coach Catering/Pantry Car
Loco:
Reversal:
Rake Reversal at Any Stn
Rake:
RSA:
With RSA
Inaug:
 to 
# Halts: to 
Trvl Time: to  (in hrs)
Distance: to  (in kms)
Speed: to  (in km/h)

Departure Details
Include nearby Stations:      ONLY this Station:
Dep Between:    
Dep PF#:
Reversal:
Rake Reversal at Dep Stn

Arrival Details
Include nearby Stations:      ONLY this Station:
Arr Days:
SunMonTueWedThuFriSat
Arr Between:    
Arr PF#:
Reversal:
Rake Reversal at Arr Stn

Search
  Go  
dark mode
 
Fri Mar 29 19:37:59 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
Post PNRPost BlogAdvanced Search
Details of Pit lines available in all BG Coaching Depots Part-1  
1 Answers
Aug 25 2022 (21:42)
General

Entry# 2364     
guest
Details of Pit lines available in all BG Coaching Depots Part-1

★★★  General Travel
394217 views
72
Jul 17 2022 (12:42)
Blog Post# 5416065-0     
Guest: 3b2583dd   Added by: guest  Aug 25 2022 (21:42)
Details of Pit Lines available in all BG Coaching Depots by Zone wise & Division wise in Indian Railways:

Part-1:

1) CENTRAL RAILWAY ZONE:
...
more...

a) Mumbai CSM Terminus:
• Mumbai CSMT – 2 Pit lines (1-22 ICF/20 LHB, 1-20 ICF/18 LHB)
• Wadi Bunder Yard (Mumbai) – 8 Pit lines (Each 26 ICF/24 LHB)
• Mazgaon Yard (Mumbai) – 6 Pit lines (1-19 ICF/17 LHB, 2-18 ICF/16 LHB, 3 17 ICF/15 LHB)
• Lokmanya Tilak – 8 Pit lines (6-26 ICF/24 LHB, 2-26 ICF/23 LHB)
• Dadar Central – 2 Pit lines (Each 17 ICF/15 LHB)
• *Kalamboli (Panvel/Navi Mumbai) – 4 New Pit lines (Each 29 ICF/26 LHB) (Under Construction)

b) Pune Division:
• Ghorpadi Coach Maintenance Complex (GCMC) – 5 Pit lines (Each 26 ICF/24 LHB)
• New Washing Siding (PUNE) – 4 Pit lines (3-16 ICF/14 LHB, 1-12 ICF)
Note: 12 Coaches length Pit line is used of maintenance of EMU rakes.
• Old Washing Siding (PUNE) – 2 Pit Lines (1-24 ICF/22 LHB, 1-15 ICF/14 LHB)
• Kolhapur – 2 Pit lines (1-24 ICF/21 LHB, 1-22 ICF/19 LHB)
• Miraj – 2 Pit lines (Each 12 ICF/10 LHB)

c) Nagpur CR Division:
• *Nagpur Coach Care Complex – 2 Pit lines (Each 26 ICF/24 LHB)
Note: There is a proposal for replacement of Old Pit lines at Nagpur with 2 New Pit Lines (Each 27 ICF/24 LHB)
• *Ajni Coach Care Complex – 1 Pit line(26 ICF/24 LHB) + 1 New Pit line (26 ICF/24 LHB) (Under Construction)
• *Balharshah – 1 New Pit Line (28 ICF/25 LHB) (Under Construction)
Note: 6 ICF coaches length Pit line extension to 28 ICF Coaches Pit Line

d) Solapur Division:
• Solapur – 3 Pit lines (2-26 ICF/24 LHB, 1-18 ICF/15 LHB)
• Kalaburagi – 1 Pit line (26 ICF/24 LHB)
• Daund – 1 Pit line (12 ICF/10 LHB)

e) Bhusaval Division:
• *Bhusaval – 3 Pit lines (1-21 ICF/18 LHB, 2-17 ICF/14 LHB) + 1 New Pit line (25 ICF/24 LHB) (Under Construction)
• Manmad – 1 Pit line (24 ICF/22 LHB)
• Amravati – 1 Pit line (24 ICF/22 LHB)
• Chalisgaon – 1 Pit line (7 ICF/6 LHB)

2) NORTHERN RAILWAY ZONE:

a) Delhi Division:
• Old Delhi (DLI) – 4 Pit lines (1-26 ICF/25 LHB, 1-25 ICF/24 LHB, 2-23 ICF/21 LHB)
• New Delhi – 13 Pit lines (2-28 ICF/26 LHB, 5-27 ICF/25 LHB, 2-27 ICF/25 LHB, 1-22 ICF/20 LHB, 1-21 ICF/19 LHB, 1-16 ICF/15 LHB, 1-10 ICF/9 LHB)
• Nizamuddin – 6 Pit lines (5-26 ICF/24 LHB, 1-27 ICF/25 LHB)
• Delhi Sarai Rohilla – 5 Pit lines (Each 27 ICF/25 LHB)
• Anandvihar Terminal – 5 Pit lines (Each 26 ICF/24 LHB)
• Shakur Basti (Delhi) – 2 Pit lines (Each 26 ICF/24 LHB)
• *Bijwasan (Delhi) – 5 New Pit lines (Each 27 ICF/25 LHB) (Under Construction)
• Meerut City – 1 Pit line (24 ICF/22 LHB)
• Jind – 1 Pit line (18 ICF/17 LHB)
• Panipat – 1 Pit line (14 ICF/13 LHB)

b) Lucknow NR Division:
• Lucknow Charbagh – 6 Pit lines (1-26 ICF/24 LHB, 1-26 ICF, 1-18 ICF, 1-17 ICF, 1-15 ICF, 1-12 ICF)
• *Varanasi Junction – 4 Pit lines (1-26 ICF/24 LHB, 1-26 ICF, 2-22 ICF) + 2 New Pit lines (26
ICF/24 LHB) (Under Construction)
• Ayodhya Cantt/Faizabad – 3 Pit lines (1-21 ICF, 2-08 ICF)
• Sultanpur – 2 Pit lines (Each 26 ICF/24 LHB)
• *Rae Bareli – 1 Pit line (14 ICF) + 2 New Pit lines (26 ICF/24 LHB) (Under Construction)
• Prayagraj Sangam – 2 Pit lines (Each 26 ICF/24 LHB)
• *Pratapgarh – 1 Pit line (8 ICF) + 1 New Pit line (26 ICF/24 LHB) (Under Construction)

c) Firozpur Division:
• Firozpur Cantt – 2 Pit lines (Each 24 ICF/22 LHB)
• Amritsar – 6 Pit lines (2-26 ICF/24 LHB, 1-25 ICF/24 LHB, 1-22 ICF/20 LHB, 1-21 ICF/19 LHB, 1-18 ICF/16 LHB)
• Chheharta (Amritsar) – 2 Pit lines (27 ICF/26 LHB)
• Jammu Tawi – 3 Pit lines (Each 24 ICF/22 LHB)
• SVDK (Katra) – 2 Pit lines (Each 26 ICF/24 LHB)
• *Badgam (Srinagar) – New Coaching Depot Proposed (Survey is under Process for finalization site plan & No. Of Pit lines)

d) Ambala Division:
• Chandigarh – 2 Pit lines (Each 25 ICF/24 LHB)
• *Ambala Cantt – 2 Pit lines (1-17 ICF/16 LHB, 1-13 ICF/12 LHB) + 1 New Pit line (24 ICF/22 LHB) (Proposed)
• Saharanpur – 2 Pit lines (Each 13 ICF/12 LHB)
• Bathinda – 2 Pit lines (1-14 ICF/13 LHB, 1-11 ICF/10 LHB)
• Nangal Dam – 1 Pit line (15 ICF/14 LHB)
• Kalka – 2 Pit lines (1-13 ICF/12 LHB, 1-12 ICF/11 LHB)
• *Amb Andaura – 1 New Pit line (26 ICF/24 LHB) (Proposed)

e) Moradabad Division:
• *Bareilly Junction – 3 Pit lines (1-24 ICF/22 LHB, 1-18 ICF/16 LHB, 1-16 ICF/14 LHB) + 2 New Pit lines (Under Construction)
• Dehradun – 2 Pit lines (Each 19 ICF/17 LHB)
• Yog Nagari Rishikesh – 2 Pit lines (Each 26 ICF/24 LHB)
• Haridwar – 2 Pit lines (1-24 ICF/22 LHB, 1-22 ICF/20 LHB)
• Moradabad – 2 Pit lines (1-13 ICF/12 LHB, 1-09 ICF/08 LHB)
• Najibabad – 1 Pit line (13 ICF/12 LHB)
• Balamau – 2 Pit lines (1-10 ICF/09 LHB, 1-07 ICF/09 LHB)

3) EASTERN RAILWAY ZONE:

a) Howrah Division:
• *Tikiapara Coaching Depot (Howrah) – 15 Pit lines (2-26 ICF/24 LHB, 3-24 LHB/22 ICF, 2-23 ICF/21 LHB, 2-21 ICF/19 LHB, 2-19 ICF/17 LHB, 1-18 ICF/16 LHB, 1-17 ICF/16 LHB, 2-17 ICF/15 LHB) + 4 New Pit lines (1-26 ICF/23 LHB, 2-23 ICF/21 LHB, 1-20 ICF/18 LHB) (Proposed)
• Liluah Coaching Depot/Sorting Yard (Howrah) – 10 Pit lines (1-26 ICF/24 LHB, 7-24 ICF/22 LHB, 1-22 ICF/20 LHB, 1-12 ICF/10 LHB)
• *Jheel Siding Coaching Depot (Howrah) – 1 Pit line (13 ICF/11 LHB) + 2 New Pit lines (Each 26 ICF/24 LHB) (Under Construction)
• Barddhaman Jn – 2 Pit lines (Each 08 ICF/06 LHB)
• Azimganj – 2 Pit lines (Each 09 ICF/07 LHB)

b) Sealdah Division:
• Sealdah – 8 Pit lines (3-24 ICF/22 LHB, 1-23 ICF/21 LHB, 3-22 ICF/21 LHB, 1-18 ICF/16 LHB)
• *Kolkata – 3 Pit lines (2-24 ICF/22 LHB, 1-21 ICF/19 LHB) + 1 New Pit line (13 ICF/12 LHB) (Under Construction)

c) Asansol Division:
• Asansol – 4 Pit lines (3-24 ICF/22 LHB, 1-20 ICF/18 LHB)
• *Madhupur – 1 New Pit line (24 ICF/22 LHB) (Under Construction)
• * Deoghar – 1 New Pit line (14 ICF/12 LHB) (Under Construction)

d) Malda Division:
• Malda Town – 3 Pit lines (Each 24 ICF/22 LHB)
• *Bhagalpur – 3 Pit lines (2-24 ICF/22 LHB, 1-20 ICF/18 LHB) + 1 New Pit line (24 ICF/22 LHB) (Under Construction)
• Jamalpur – 1 Pit line (17 ICF)
• Sahibganj – 1 Pit line (12 ICF)
• *Godda – 1 New Pit line (24 ICF/22 LHB) (Proposed)

4) WESTERN RAILWAY ZONE:

a) Mumbai WR Division:
• Mumbai Central – 6 Pit lines (1-25 ICF/23 LHB, 1-24 ICF/23 LHN, 3-24 ICF/22 LHB, 1-21 ICF/19 LHB)
• Bandra Terminus – 5 Pit lines (Each 24 ICF/22 LHB)
• Surat – 3 Pit lines (1-26 ICF/ 24 LHB, 2-25 ICF/23 LHB)
• Udhna (Surat) – 2 Pit lines (1-26 ICF/24 LHB, 1-24 ICF/22 LHB)
• Valsad – 2 Pit lines (Each 24 ICF/22 LHB)

b) Ahmedabad Division:
• Ahmedabad BG Coaching Depot – 4 Pit lines (1-21 ICF/20 LHB, 3-17 ICF/15 LHB)
• Kankaria Coaching Depot (Ahmedabad) – 5 Pit lines (Each 27 ICF/25 LHB)
• *Sabarmati Coaching Depot – 2 Pit lines (Each 27 ICF/24 LHB) + 2 New Pit lines (Each 27 ICF/24 LHB) (Under Construction)
• Gandhidham – 2 Pit lines (1-25 ICF/23 LHB, 1-24 ICF/22 LHB)
• Bhuj – 1 Pit line (24 ICF/22 LHB)

c) Ratlam Division:
• Indore BG Coaching Depot – 6 Pit lines (5-24 ICF/22 LHB, 1-09 ICF)
• *Dr. Ambedkar Nagar (Mhow) – 2 Pit lines (24 ICF/22 LHB) + 1 New Pit line (24 ICF/22 LHB)
Note: At DADN Pit lines-1 & 2 are Extending upto 26 ICF/24 LHB Coaches (Under Process)

d) Vadodara Division:
• Pratapnagar Coaching Depot (Vadodara) - 1 Pit line (26 ICF/24 LHB)
e) Rajkot Division:
• *Rajkot – 1 Pit line (24 ICF/22 LHB) + 1 New Pit line (27 ICF/24 LHB) (Under
Construction)
• *Okha – 1 Pit line (24 ICF/22 LHB) + 1 New Pit line (26 ICF/24 LHB) (Sanctioned but Construction yet not started)
• Hapa – 1 Pit line (26 ICF/24 LHB)

f) Bhavnagar Division:
• Bhavnagar – 2 Pit lines (Each 26 ICF/24 LHB)
• Porbandar – 1 Pit line (24 ICF/22 LHB)
• Veraval – 1 Pit lines (1-26 ICF/24 LHB)

5) SOUTHERN RAILWAY ZONE:

a) Chennai Division:
• Basin Bridge Coach Care Complex (Chennai Central) – 16 Pit lines (6-24 ICF/24 LHB, 4-21 ICF/19 LHB, 2-20 ICF/18 LHB, 2-19 ICF/17 LHB, 2-15 ICF/13 LHB)
• Gopalsamy Nagar Coaching Depot (Chennai Egmore) – 3 Pit lines (1-26 ICF/24 LHB,
1-24 ICF/22 LHB, 1-18 ICF/16 LHB)
• *Tambaram – 2 Pit lines (26 ICF/24 LHB) + 2 New Pit lines (26 ICF/24 LHB) (Under Construction)

b) Madurai Division:
• Madurai – 4 Pit lines (3-26 ICF/24 LHB, 1-24 ICF/22 LHB)
• Tirunelveli – 3 Pit lines (Each 26 ICF/24 LHB)
• Rameswaram – 2 Pit lines (Each 26 ICF/24 LHB)
• Tuticorin – 1 Pit line (21 ICF/19 LHB)

c) Tiruchchirappalli Division:
• Tiruchchirappalli – 3 Pit lines (2-24 ICF/22 LHB, 1-13 ICF/11 LHB)
• Villupuram – 1 Pit line (26 ICF/24 LHB)
d) Salem Division:
• Coimbatore – 2 Pit lines (Each 26 ICF/24 LHB)
• Erode – 2 Pit lines (1-24 ICF/22 LHB, 1-10 ICF/08 LHB)

e) Thiruvananthapuram Division:
• Thiruvananthapuram – 5 Pit lines (1-26 ICF/24 LHB, 2-24 ICF/22 LHB, 1-20 ICF/18 LHB)
• Kochuveli – 3 Pit lines (Each 24 ICF/22 LHB)
• *Nagercoil – 3 Pit lines (Each 26 ICF/24 LHB)+ 2 New Pit lines (26 ICF/24 LHB) (Under Construction)
• Ernakulam – 3 Pit lines (Each 26 ICF/24 LHB)
• Alappuzha – 1 Pit line (18 ICF/16 LHB)

f) Palakkad (Palghat) Division:
• *Mangalore Central – 3 Pit lines (2-24 ICF/22 LHB, 1-18 ICF/16 LHB) + 1 New Pit line (24 ICF/22 LHB) (Under Construction)
• Shoranur – 1 Pit line (12 ICF/10 LHB)


Source: Through RTI filed by me
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy