पनवेल-कर्जत नव्या रेल्वे कॉरिडॉरचे ५६ टक्के काम पूर्ण; २९.६ किमी लांबीचा प्रकल्पThe construction of a new suburban railway corridor between Panvel and Karjat is progressing well, with 56% of the project completed. The 29.6 km corridor, costing ₹2,782 crore, involves three tunnels, two flyovers, 44 bridges, and 22 underpasses. The longest tunnel, the 2 km Wawarali Tunnel, is already finished. The...
more... project aims to provide local train services between Mumbai and Karjat via Panvel using a new double-line corridor. The addition of ballast-less tracks, public shelter areas, a tunnel control system, lighting, fire-fighting mechanisms, and ventilation systems is underway. The project is expected to be completed by December 2025. The corridor will include stations at Panvel, Mohope, Chikle Chowk, and Karjat.
Panvel aur Karjat ke beech ek naya suburban railway corridor bana raha hai aur 56% kam pura ho chuka hai. 29.6 km lamba yeh corridor, ₹2,782 crore me ban raha hai, aur isme teen tunnels, do flyovers, 44 bridges, aur 22 underpasses hain. Sabse lamba tunnel, 2 km ka Wawarali Tunnel,...
more... pura ho chuka hai. Yeh project Mumbai aur Karjat ke beech Panvel se local train service dene ka lakshya rakhta hai aur isme ek naya double-line corridor banaya ja raha hai. Ballast-less tracks, public shelter areas, tunnel control system, lighting, fire-fighting mechanisms, and ventilation systems ka kam chal raha hai. Project December 2025 tak pura hone ki umeed hai. Corridor me Panvel, Mohope, Chikle Chowk, aur Karjat station honge.