Is this vb need a big rake why don't they start with small rake and then upgrade and bza mas Route is not as long as other vbs running around, a full rake is acceptable if they start it from sc or vskp two big metro cities or temple Cities are needed to fill bigger rakes and the timings are also not good it will just reach mas minutes before Pinakini better start at 6 am from bza at present sc tpty vb taking 2h49 min for 249 km strech between gnt nlr with scope of bit speedup of around 10 min so this bza mas vb can have same duration between BZA NLR as Distance is almost same and nlr mas is taking 2h30 min for many trains due to 130 kmph upgradation so this vb can do that in 2 hours so if even 4h45 min schedule is possible...
more... between BZA MAS if they try but still 5h duration is also ok but the timings should
Bza 6 AM
MAS 11 AM
Return
MAS 4 PM
BZA 9 PM
pinakini timings can be slightly tweaked
Vb should start only after 4 pm from so people have more turnaround time unlike pinakini which start immediately at 2pm from mas