I have made an Imaginary train between BKN and AGTL but I have some points regarding this...
~Operational Constraints
Total 6 locos are required
...
more... 1 D between BKN and JP
1 E between JP and GHY
1 D between LKO and MAU (For Piggy Back)
1 D between GHY and AGTL
2 D between LMG and BPB (Bankers)
~Reversals
Total 2 reversals required
SHG
LMG
~PF blockage for operational reasons
Total time for PF blockage for operational reasons= 1h 55 mins
15 mins for LC at JP
20 mins for attaching eloco at back and dloco at front at LKO
20 mins for ↵ @SHG and attaching dloco in front of eloco which was at back originally
10 mins at MAU for detaching dloco
15 mins for LC at GHY
25 mins for ↵ @LMG + banker attach
10 mins at BPB for detaching bankers
~Stops and other Misc.
Total stops incl. SRC and DSTN: 48
Avg Speed incl. halts: nearly 50 kmph
Category: M/E
Will this train receive good reviews from you all or from public as I'm sure rly will never operate such train with such operational constraints. I'll upload only if it could be successful.