Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Mon Sep 30 00:53:18 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Post PNRPost BlogAdvanced Search
Filters:

Page#    54 Blog Entries  <<prev  next>>
Info Update
7848 views
1

Nov 24 2023 (10:24)   CSMT/Mumbai CSM Terminus (18 PFs)
Exynos9611~
Exynos9611~   24936 blog posts
Entry# 5892041            Tags  
#Admin #Moderator Source Cr X Handle

#CRInfraUpdates
Major Upgradation of Chhatrapati Shivaji Maharaj Terminus (CSMT) Railway Station Underway: Transforming the Transportation & Heritage Hub.
🔸Cost- ₹2450 Crores.
...
more...

🟠Scope of Work:
➡️Construction of passenger-related retail buildings, parcel buildings, linen buildings, Mechanical Department buildings.
➡️Long-distance and suburban nodes and concourses, foot over bridges (FOBs), skywalks
➡️Thorough roof refurbishment, development of circulating areas, restoration of heritage buildings, landscaping, art works, ballastless tracks, and boundary walls
➡️DRM complex (G+4), rest houses (G+2), new headquarters for Central Railway at the Heritage Node (G+4).

🟠Current Status:
➡️Site office setup completed.
➡️Drone survey, GPR (Ground Penetrating Radar) survey, hard barricading work, soil investigation, and mobilization of site works are completed
➡️Topographical survey, aerial survey, and GTI (Geotechnical Testing & Inspection) in circulating areas near Platform no. 18 are completed.
➡️Inventory details for Traffic Accounts Building, New Administrative Building, old annex building, parcel office building, and PF no 18 side are being compiled
➡️Shore piling work, Utility Survey and Temporary office shifting, Inventory of existing structures and support activity at Wadibunder works are in Progress.

🟠Area Statement:
➡️The total area of development at Chhtrapati Shivaji Maharaj Terminus will be 4,61,534 sq mts out of which- ➡️New construction will be 2,79,507 sq meters
➡️Refurbishment area will be 1,30,912 sq meters
➡️Circulation area will consist of 37,703 sq meters
➡️Other landscaping works of 13,412 sq meters

🟠Ongoing Activities:
➡️Finalization of Master Layout: Barricading of LD Node Area - 21 % completed uptill now.
➡️Setting up of Batching Plant at CSMT & Wadibunder.
Setting up of Modular Permanent Site Offices - 90 % work completed till now.
➡️Shore Piling in DRM Complex Area - 75 % completed now.
➡️Construction of Temporary Parcel Office near Platform No. 18: Shifting of Utilities in proposed DRM Complex Construction Area:

CR is committed for delivering a world-class railway station, blending modern infrastructure with the rich heritage of CSMT. The ongoing activities reflects our dedication towards the quality in this transformative journey.

Translate to English
Translate to Hindi
Info Update
20205 views
8

Nov 24 2023 (10:22)   AJNI/Ajni (Nagpur) (3 PFs)
Exynos9611~
Exynos9611~   24936 blog posts
Entry# 5892037            Tags  
1 compliments
Useful
#Admin #Moderator Source Cr X Handle

#CRInfraUpdates
✳️Ajni Terminal Development as satellite terminal-
Nagpur div
💲Cost
...
more...
– 45.33 Cr
🛑Overall Physical Progress – 40%

✳️Scope of work-
➡️Construction of 4 nos. stabling lines with secondary maintenance facilities.
➡️Construction of 1 pit line.
➡️Construction of Service buildings for Mechanical department.
➡️Construction of 2 new platforms with 2 new loop lines.
➡️Construction of cover over shed with coach watering facility.
➡️Construction of foot over bridge connecting existing platforms to proposed platforms.

✳️Completed work-
➡️Contracts for all Civil Engr works like washing pit carriage watering arrangement, pathway, service building, stabling lines etc. awarded.
➡️All service buildings completed.
➡️Washing pit of 585 mtr completed.
➡️4 stabling line linking completed.
➡️Electrical & OHE contract awarded.
➡️All infringement removed for phase I work.

✳️Work In Progress –
⏩Construction of New High level platforms with 2 loops of 26 coach length & covershed of 500 mtr with carriage watering arrangement.
⏩Construction of FOB connectivity to Proposed platforms.

🛑CR is committed for gradual improvement in amenities for our passengers.

Translate to English
Translate to Hindi
Info Update
23119 views
12

★★
Nov 17 2023 (09:27)   IGP/Igatpuri (4 PFs)
Exynos9611~
Exynos9611~   24936 blog posts
Entry# 5884589            Tags  
2 compliments
Agree Useful
#Admin #Moderator Source Cr X Handle

Kindly Update It

#CRInfraUpdates
🟠CR
...
more...
infra works leads to speeding up of 12 trains running at 130 kmph on Igatpuri-Nashik- Bhusaval-Akola- Badnera section of 526.65 km from 10/11/23.

CR presently running trains at 130 kmph on 1111.33 km-
✅Igatpuri-Bhusaval- Badnera section- 526.65 km
✅Pune-Daund section- 75.59 km
✅Itarsi-Nagpur- Wardha-Ballarshah section- 509.09 km
➡️Work in progress on Daund-Solapur- Wadi section- 337.44 km

✅Following 12 trains started running with 130 kmph from 10/11/23 on Igatpuri-Nashik- Bhusaval-Akola- Badnera section-
1) 12111 CSMT-Amravati Exp
2) 12112 Amravati-CSMT Exp
3) 12290 Nagpur-CSMT Exp
4) 12860 Howrah-CSMT Exp
5) 12289 CSMT-Nagpur Exp
6) 12859 CSMT-Howrah Exp
7) 12106 Gondia-CSMT Exp
8) 12810 Howrah-CSMT Exp
9) 12105 CSMT-Gondia Exp
10) 12809 CSMT-Howrah Exp
11) 22221 CSMT-Hazrat Nizamuddin Rajdhani Exp (Igatpuri-Bhusaval)
12) 22222 Hazrat Nizamuddin-CSMT Rajdhani Exp (Bhusaval- Igatpuri)

Translate to English
Translate to Hindi

1 Public Posts - Mon Nov 20, 2023
Info Update
50597 views
4

Nov 13 2023 (10:55)   TAZ/Targaon (1 PFs)
Exynos9611~
Exynos9611~   24936 blog posts
Entry# 5879989            Tags  
1 compliments
Great
#Admin #Moderator Source Drm Pune X Handle

@Central_Railway
#CRInfraUpdates
🛤️Pune-Miraj Doubling Project on Targaon-Masur block section:-
▶️Project
...
more...
Length:12.67km
🌉Major Bridges: 1
Minor Bridges: 20
ROB/RUB/LHS: 2
📈Progress: 85%

Benefits:
🔹Will boost the efficiency of passenger & freight train operations

Translate to English
Translate to Hindi
Info Update
33585 views
13

★★
Nov 12 2023 (17:01)   AJNI/Ajni (Nagpur) (3 PFs)
Exynos9611~
Exynos9611~   24936 blog posts
Entry# 5879589            Tags  
6 compliments
Great Great Useful Useful Useful Great
#Admin #Moderator Source Cr X Handle

#CRInfraUpdates
🟩Development of Ajni Station as satellite terminal with construction of 2 new platforms and 2 looplines of 26 coach length

💰Cost-45.33
...
more...
Crores
✅ Overall Physical progress-30% completed.

A) Scope of work-
🔘Construction of 2 new platforms
🔘Construction of 2 new looplines
🔘Construction of 4 new stabling lines with secondary coach maintenance facility
🔘Construction of 1 new Pit line for train examination
🔘Construction of service buildings for mechanical works
🔘Construction of Cover over shed of 500 meter on platform
🔘Construction of coach water facility
🔘Construction of 2 new FOBs (Foot over bridges) for connecting new proposed platforms.

B) Completed works-
🔘All contracts awarded for construction of all civil works, new platforms, covershed on platforms, washing pit lines, stabling lines, coach watering pathway, service buildings
🔘All service buildings such as mechanical work completed
🔘Washing pit line of 585 meter construction completed. Track linking in progress.
🔘Track linking of 4 stabling lines completed
🔘OHE (OverHead Equipment) & Electrical tenders awarded.
🔘Signalling & telecom infringement obstruction removal work in progress.

🔴Completion of these project new platforms will improve mobility of trains in Nagpur area and will reduce congestion.

Translate to English
Translate to Hindi
Page#    54 Blog Entries  <<prev  next>>

Travel SAFE

1. RailFanning does NOT MEAN dangerous pics/videos.
2. Doorplating pics/youtube videos are strictly FORBIDDEN in IRI.
3. Take plenty of food pics and other safe pics.
4. Write human interest narratives to make the pics interesting.
5. Enjoy blogging and travelling SAFELY.

REMEMBER: YOUR LIFE is the most precious thing, NOT RailFanning.

Leading Polls

5383447 ★★★ 145jishnuthakur12301^...
3247625 ★★★ 134~
2308508 ★★★ 38Yantravinyas
3368675 ★★★ 397mr.train_wala~

Rail News

New Trains

Site Announcements

  • Entry# 5648027
    Mar 01 2023 (12:44AM)


    In response to past confusions with Train/Station updates and resulting fights and controversies, the following clear and objective guidelines are being issued, with no room for any arguments or debates about validity. Also, included, some other changes with respect to Ratings. 1. All Red Ratings will require further explanation. Red Ratings won't...
  • Entry# 5388512
    Jun 24 2022 (08:45AM)


    As announced previously, there are a few changes coming to IRI user accounts, based on past practices. 1. As before, you will be able to quickly DELETE your IRI User account at ANY time. However, the menu option for this was hidden in the profile page, and could not easily be located....
  • Entry# 5148000
    Nov 29 2021 (06:40AM)


    A new feature will be released soon, whereby you can follow blogs tagged with specific Trains & Stations. If you have already posted blogs tagged with some Train/Station, then you will be set to automatically follow that Train/Station. Thereafter, any future news/blogs tagged with those Trains/Stations will be marked to your...
  • Entry# 5093784
    Oct 13 2021 (07:04AM)


    These days, every other day, we are getting requests from members to allow email login to their FB-based IRI account. 10 years ago, we had given the option for users to login through FaceBook - in retrospect, this was a mistake. These days, apparently, users are quitting FaceBook in droves because...
  • Entry# 4906979
    Mar 14 2021 (01:12AM)


    Followup to: Fmt Changes The new version of FmT 2.0 will soon be here - in about 2 weeks. As detailed in the previous announcement, many of the old FmT features like Train TT, Speedometer, Geo Location, etc. will be REMOVED. It will be a bare-bones simple app, focused on trip blogging. It...
  • Entry# 4898771
    Mar 06 2021 (10:33PM)


    There are some changes coming to FMT. Many of the features of FMT, like station arrival, TT, speed, geo, passing times, station time, etc. are ALREADY available in OTHER railway apps. So all of these features will be REMOVED. We'll have ONLY BLOGGING - quick upload of pics/videos/audio, etc. You may attach...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy